Oracle’s Project Jupiter is a 2.45GW data centre campus in New Mexico. It is part of the Stargate infrastructure supporting OpenAI. The site was designed as a self-contained power island. Oracle later switched from gas turbines to Bloom Energy fuel cells. Fuel cells still require natural gas and a pipeline not yet built. Permit and right-of-way delays hit the gas pipeline. A required air-quality permit was also delayed by legal challenges. Oracle issued a force majeure notice over power availability delays. Speed-to-power is a key metric for new data centres. Off-grid generation creates its own bottlenecks in fuel, equipment and permits. Local opposition has delayed or cancelled 146 projects. $18bn in project loans fell below face value in September. Oracle remains liable for carry costs if the first phase is late. Grid connections can take up to 10 years for large loads.
What changed
Oracle planned to use gas turbines and diesel generators for Project Jupiter.
What it unlocks
No new capability is unlocked for end users by this case study.
- 2.45GW campus capacity
- $18bn in project loans
- 146 delayed or cancelled projects
- 10-year grid connection delays
Sources